ChangelogLive
Changelog
Phase transitions and per-department updates as tools move live → building → Moonshot.
Every tool in the Creytix catalog carries a tier badge — Live, Building, or Preview — and that badge changes over time as tools mature. Live means available today. Building means it's in active development, with an honest-scope section telling you what's not there yet. Preview means early access with roadmap framing, not a GA claim.
This page logs those transitions as they happen, department by department, so you can tell at a glance what changed and when — without digging through release notes for every individual tool.
Latest
- 2026-07-08 — Creytix Dev opened in preview. The BYOK hosted agent and its model-tier selector are available for early access; the rules gateway and workspace context chips are rolling out alongside it.
- 2026-07-01 — Creytix Forge Review and Creytix Contracts moved into active development. Both now carry a Building badge — PR scorecards and contract templates are taking shape, not ready for general use yet.
- 2026-06-24 — Inspector Protect and the CI gate reached general availability. Deterministic SEO, schema, and accessibility checks now block a release before it ships, instead of just reporting after the fact.
Earlier
- 2026-06-15 — Creytix Freight Track and Creytix Trust & Compliance joined the Connect catalog, live from day one with full honest-scope docs.
- 2026-06-01 — Component gallery (Design Labs) and Asset Manager (Studio) entered active development, both marked Building while the shared component matrix and asset pipeline mature.
- 2026-05-18 — Creytix Mail and Creytix SEO OS reached general availability as the first two tools documented under Connect.